top of page
Search

How to Calculate Your Embroidery Machine's Daily Production Capacity

43 minutes ago
1 min read

How many embroidered pieces can your machine produce in one working day? Before investing in an embroidery machine, it is important to estimate your realistic production capacity.

Start with these four factors:

1. Stitching Time

Check how long your regular design takes to complete on the fabric you intend to use.

2. Number of Heads

A multi-head machine can embroider the same design on several items simultaneously, provided all heads are working on the same job.

3. Working Hours

Calculate the actual production time available during your shift, excluding breaks and non-production periods.

4. Production Interruptions

Allow time for hooping, changing garments, thread breaks, colour changes and machine stops.

Example: If a four-head machine takes 20 minutes to complete one design, it can theoretically produce 12 batches in four hours, or 48 pieces. Actual output may be lower once setup and interruptions are included.

Tai Sang Buyer Tip:

Test your own design and fabric during a machine demonstration, record the complete cycle time, and use that figure to estimate daily output.

Plan your investment around realistic production capacity—not just the machine's advertised speed.




 
 
 

Comments


Whatsapp
Logo

The textile, textile product, and apparel manufacturing industries include establishments that process fiber into fabric and fabric into clothing and other textile products. 

  • Facebook
  • Twitter
  • Youtube
  • Instagram

LINKS

Manufacturing Relationship; Distributing Quality
Tai Sang Embro
103, unit 8, building 2
Guang An Xin Cun
Zhuji. Zhejiang. China 311800

+86 575 87032702

© 2023 Tai Sang Embro | Powered by UniPegasus Infotech Solutions.

Terms and Conditions

bottom of page